How do you tell what the current footprint is for embedded items in your track (how close you are to the limit)?
What happens when you exceed that limit? Is there some sort of notification?
I have a track with embedded items that I'm working on, and I periodically mail it to work to test during my lunch hour. Suddenly, today, none of the embedded items are showing up. They've been working fine previously, even though I don't have those items installed locally at work.
I added another item or two over the weekend, so I assume that if you exceed the limit, TM just says "screw you" and embedded items just stop working entirely?
Is that correct, or is something else going on?